| C912 Zone 2 (station) |
![]() |
| Overview of Bukit Panjang station |
| C&C tunnels to Gali Batu Depot |
![]() |
| South-North view of station, which has nearly been completely backfilled |
| 500m radius terminal crossover tunnel south of BKP (Zone 1) |
| Service walkways leading to the circular shafts where the ventilation building will be built |
| Cut and Cover tunnels starting from the north end of BKP, flyover pillars in the background |
| C&C tunnels heading north towards Gali Batu |
| Aerial View of C&C tunnels (Zone 3) |
| Aerial View of C&C tunnels (Zones 4&5) |
![]() |
| Beneath the surface |
| Backfilling in progress |
| Roof Slab has been casted |
| Works on the flyover landing would commence after the C&C is covered |
| Sequence of direct backfilling (1) |
| Sequence of direct backfilling (2) |
| Sequence of direct backfilling (3) |
| Sequence of direct backfilling (4) |
| Backfilled layer |
| Backfilling with the use of a lorg arm excavator |