C912 Zone 2 (station) |
Overview of Bukit Panjang station |
C&C tunnels to Gali Batu Depot |
South-North view of station, which has nearly been completely backfilled |
500m radius terminal crossover tunnel south of BKP (Zone 1) |
Service walkways leading to the circular shafts where the ventilation building will be built |
Cut and Cover tunnels starting from the north end of BKP, flyover pillars in the background |
C&C tunnels heading north towards Gali Batu |
Aerial View of C&C tunnels (Zone 3) |
Aerial View of C&C tunnels (Zones 4&5) |
Beneath the surface |
Backfilling in progress |
Roof Slab has been casted |
Works on the flyover landing would commence after the C&C is covered |
Sequence of direct backfilling (1) |
Sequence of direct backfilling (2) |
Sequence of direct backfilling (3) |
Sequence of direct backfilling (4) |
Backfilled layer |
Backfilling with the use of a lorg arm excavator |