Reinstatement works around the entrance and south vent building |
Wednesday 15 July 2015
Tan Kah Kee Clads
Architectural works have commenced on the overhead linkway and Entrance B. The roof of the linkway have been partially completed, while vertical honeycomb-like frames - signature to the station's design, have been installed along the sides of the bridge. Entrance B is also being fitted with the panels on the exterior, and cladding is being done on the interior roof as well.
Monday 6 July 2015
Gardens Reinstatement
Friday 3 July 2015
Stevens Reinstates