Day 2, Cashew

Moving down the line, we look at Cashew Station under C913. Currently, it is one out of 4 stations that have begun structural works on the surface entrances and ventilation shafts.

South Vent Shafts has achieved BSC
The 2 structures are symmetrical
North Vent Shaft will be integrated beside the station exit
Station exit in the right background
Lift shaft and escalators covered in tarp. 
A glass structure would soon be erected here for the entrance box.
Road reinstatement could take place by the end of the year
Pit where the south launch shaft used to be located, for the drives to Hillview