Saturday 21 March 2015

Newton Clads

Cladding works to the entrance and cooling tower at the Newton station have completed. The mechanical and electrical fixtures are also about complete, and the ceiling lights of the entrance have been observed to be turned on during the day. The cooling tower has been painted with an orange strip near the roof to match the livery of the existing NSL station. In addition, the transition of doors to shutters was implemented at the NSL concourse as part of the A&A works to better improve commuter flow for the future transfer between the Downtown Line.

Photos in this update were collectively taken over February and March. With this post. the 1st Quarter updates for the Downtown Line 2 conclude.


March 16 - Completed Entrance with skylights covered
Render of the entrance (Cr: SAA)
Feb 13 - Cladding works ongoing at the entrance
Feb 13 - Escape Shaft
Mar 13 - Sheltered linkways between the entrance and bus stop
Mar 13 - Sheltered linkway between the entrance and bus stop
Mar 13 - Permanent bus stop
Mar 13 - M&E works to the entrance ceiling
Render of the sheltered linkway leading to the entrance (Cr: SAA)
Mar 13 - Sheltered linkway to the entrance
Mar 13
Mar 13
Mar 13
Feb 1 - Removal of door frame
Mar 16 - Transition to shutters
Mar 16 - Bus bay
Mar 16 - Cooling Tower
Mar 16 - Cooling Tower
Mar 16 - Cooling Tower
Mar 16
Mar 16
Mar 16
Mar 16