Sunday, 21 December 2014

Garden's Surface

Back on the surface, the final touches on casting works of the concrete superstructures are almost completed. The ventilation unit has arrived and positioned inside the cooling tower. Steel frame segments are also seen beside the entrance, a strong indication of the impending works of covering up the entrance.

Botanic Gardens worksite

Cooling tower

Preparations to reinstate the future street pavement
Station entrance
Station entrance with its flood prevention stairs