Back on the surface, the final touches on casting works of the concrete superstructures are almost completed. The ventilation unit has arrived and positioned inside the cooling tower. Steel frame segments are also seen beside the entrance, a strong indication of the impending works of covering up the entrance.
Botanic Gardens worksite |
Cooling tower |
Preparations to reinstate the future street pavement |
Station entrance |
Station entrance with its flood prevention stairs |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.