Fittings at the Beauty World station are almost completed. The hoisting and installation of glass panels commenced at the start of last month on Entrances A and B, and have completed since then. Entrance C's roof has been covered with an aluminium sheet and should commence architectural fittings soon. The network of covered linkways surrounding entrance B have been structurally completed.
|
Entrance B |
|
Platform of Beauty World (Photo cr: Lito) |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.