As mentioned in the previous post on Bedok North, CTCI is the trackworks contractor for stage 3 of the Downtown Line. Works have already begun on site for the laying of tracks along stage 3, beginning with the immediate vicinity of Bedok North. This will be a hub from which all tracks along stage 3 are laid. The other Temporary Staging Area (TSA) will be located at Bendemeer station where the former tunnel works staging area has been cleared (more later on).
