Track laying within Newton station |
Track laying within Newton station |
The 'floating slab' method was chosen to construct the trackbed |
Entering the Expo bound tunnel to Stevens |
The gap to the left will be reserved for the tunnel walkway to be constructed upon completion of the second stage concrete |
Track has been laid past Hume station |
Any latest track updates for DTL2. Thanks