| Track laying within Newton station |
![]() |
| Track laying within Newton station |
![]() |
| The 'floating slab' method was chosen to construct the trackbed |
![]() |
| Entering the Expo bound tunnel to Stevens |
![]() |
| The gap to the left will be reserved for the tunnel walkway to be constructed upon completion of the second stage concrete |
![]() |
![]() |
| Track has been laid past Hume station |








Any latest track updates for DTL2. Thanks
ReplyDelete