Reinstatement works around the entrance and south vent building |
More About Us
▼
Wednesday, 15 July 2015
Tan Kah Kee Clads
Architectural works have commenced on the overhead linkway and Entrance B. The roof of the linkway have been partially completed, while vertical honeycomb-like frames - signature to the station's design, have been installed along the sides of the bridge. Entrance B is also being fitted with the panels on the exterior, and cladding is being done on the interior roof as well.